“62% of the pipes needed to build the Albanian and Greek stretch of the TAP have been backfilled,” the Trans Adriatic Pipeline (TAP) AG company said in its Twitter account. “In Albania and GREECE, 765 km line pipes welded and approximately 475 km back-filled,” the company added. The Trans Adriatic ...