Pages

Friday, November 10, 2023

Power of Greece-Bulgaria interconnector to be increased

The capacity of the Greece-Bulgaria gas interconnector (IGB) can be increased to 5 billion cubic meters per year within two years, Azernews reports, citing Maria Rita Galli, CEO of DESFA, the operator ...


READ THE ORIGINAL POST AT www.azernews.az