Pages

Wednesday, December 5, 2018

98% of TAP route in Greece, Albania lowered into trench

Around 98 percent of the Trans Adriatic Pipeline (TAP) route in Greece and Albania has been lowered into the trench, said a message from TAP AG consortium engaged in construction of the pipeline ...


READ THE ORIGINAL POST AT en.trend.az