Pages

Friday, September 7, 2018

Over 91% of TAP pipes lowered into ground in Greece, Albania

More than 91 percent of pipes for construction of the Trans Adriatic Pipeline (TAP) have been lowered into the ground in Greece and Albania, said a message from the TAP AG consortium ...


READ THE ORIGINAL POST AT en.trend.az