Pages

Wednesday, May 2, 2018

High speed AZIMUT connecting Ionian islands in operation as of May 2

The sea route connecting the Ionian islands with each other was launched at 6:30 in the morning on Wednesday, May 2nd 2018. High Speed ship “Azimut” set sail from the island of Corfu for the islands of Paxos, Ithaca (Pisaetos port), Lefkada, Kefallonia (Sami port) and Zakynthos. The total capacity of the ship is 170 … The post High speed AZIMUT connecting Ionian islands in operation as of May 2 appeared first on Keep Talking Greece.


READ THE ORIGINAL POST AT www.keeptalkinggreece.com