Pages

Monday, January 29, 2018

2/3 of TAP pipes lowered into ground in Greece, Albania

Currently, around 2/3 of pipes (over 515km out of 765km) have been lowered into the ground as part of construction of the Trans Adriatic Pipeline (TAP) in Greece and Albania, said a message from TAP AG consortium. “Side boom tractors are used to lower ...


READ THE ORIGINAL POST AT en.trend.az