Pages

Thursday, October 27, 2016

Over 50% of pipes for TAP delivered in Greece, Albania

More than 50 percent of steel pipes needed for construction of the Trans-Adriatic Pipeline (TAP) have been delivered in Greece and Albania, according to the message posted on TAP’s Twitter page. TAP project envisages transportation of gas from the Stage ...


READ THE ORIGINAL POST AT en.trend.az