Pages

Tuesday, September 20, 2016

TAP’s construction progressing in Greece

The construction of the Trans Adriatic Pipeline (TAP), which is designed to transport Azerbaijani gas to Europe, is progressing in Greece. TAP AG tweeted that over 17km line pipes have been strung and 5km welded along the pipeline route in Greece.


READ THE ORIGINAL POST AT en.trend.az